In the pre-measurements and measurements, the calculation of the tasks that will be performed or have been performed is done based on the accurate on-site data collection, measurement of dimensions, and details.
With pre-measurement, the calculations for the cost of the project to be executed can be derived, while with measurement, the geometric dimensions of the completed project are precisely determined.
Factors of Pre-measurements and Measurements
The factors that define the study of the system are the existing condition, the architectural plans (floor plans, elevations, sections), the structural plans, thedetail drawings, thematerial specifications, and the price budget.
Elements of Pre-measurements and Measurements
he deliverable document for the pre-measurements and measurements includes the following:
– Type of Project
– Unit of measurement
– Quantity of material
– Unit price
– Categories and sub-categories of work
– Cost
At ΙΩΝΙΚΗ Engineering, we undertake the completion of the measurement and the calculation of the cost of the project with a high degree of convergence.
- Issuance of a Deviation Approval
- Issuance of Licenses by the Development Directorate
- Implementation Studies
- Topographical Diagram
- Study of input – output
- Architectural Study
- Design of Industrial Spaces
- Photorealistic Rendering
- Axle Loading Study
- Study Of Elevator
- Study of Special Networks
- Engineering study
- Study Of Thermal Insulation
- Sound Insulation Study
- Study of Stream Delimitation
- Study of industrial safety
- Interior Decoration
- Study Of Heating And Air Conditioning
- Supervision & maintenance of mechanical equipment
- Scheduling & costing Project
- Occupational Risk Assessment Study
- Study of Heating Cost Distribution
- Issuance of Permits, Regulation of Violations
- Study of Environmental Space Design
- Building Energy Performance Study
- Static Study-Study of static adequacy
- Study of Electrical Installations
- Studies of combustible gases / natural gas
- Study of Organization and Operation of Industry
Pre-measurements/Measurements
Ioanna Sachbazidou
Civil engineer
ΙΩΝΙΚΗ Engineering
In the pre-measurements and measurements, the calculation of the tasks that will be performed or have been performed is done based on the accurate on-site data collection, measurement of dimensions, and details.
With pre-measurement, the calculations for the cost of the project to be executed can be derived, while with measurement, the geometric dimensions of the completed project are precisely determined.
Factors of Pre-measurements and Measurements
The factors that define the study of the system are the existing condition, the architectural plans (floor plans, elevations, sections), the structural plans, thedetail drawings, thematerial specifications, and the price budget.
Elements of Pre-measurements and Measurements
he deliverable document for the pre-measurements and measurements includes the following:
– Type of Project
– Unit of measurement
– Quantity of material
– Unit price
– Categories and sub-categories of work
– Cost
At ΙΩΝΙΚΗ Engineering, we undertake the completion of the measurement and the calculation of the cost of the project with a high degree of convergence.
- Issuance of a Deviation Approval
- Issuance of Licenses by the Development Directorate
- Implementation Studies
- Topographical Diagram
- Study of input – output
- Architectural Study
- Design of Industrial Spaces
- Photorealistic Rendering
- Axle Loading Study
- Study Of Elevator
- Study of Special Networks
- Engineering study
- Study Of Thermal Insulation
- Sound Insulation Study
- Study of Stream Delimitation
- Study of industrial safety
- Interior Decoration
- Study Of Heating And Air Conditioning
- Supervision & maintenance of mechanical equipment
- Scheduling & costing Project
- Occupational Risk Assessment Study
- Study of Heating Cost Distribution
- Issuance of Permits, Regulation of Violations
- Study of Environmental Space Design
- Building Energy Performance Study
- Static Study-Study of static adequacy
- Study of Electrical Installations
- Studies of combustible gases / natural gas
- Study of Organization and Operation of Industry