At a Glance
Client
ΣΜΥΡΔΕΞ
Website
smirdex.gr
Year of Assignment
2019
Location
Vitiligo, Xanthi
Area
17.468 t.m
Project budget
38.555€
Implementation Duration
2 years
Since 1981, the company ΣΜΥΡΔΕΞ offers on the domestic and world market products abrasives of high quality. With respect to the environment, with high quality products and through continuous research, the ΣΜΥΡΔΕΞ managed the continuous expansion of its activities.
Knowing gradual development, and by focusing on the commercial activity in the international market, now responsible for 85% of its production to Europe, Asia, Africa and 15% in the Greek market. The products of the ΣΜΥΡΔΕΞ are exported to more than 72 countries.
The explanatory report of utilization of the property for development purposes, through divestiture
The premises of the ΣΜΥΡΔΕΞ, due to rapid increase of the capacity of the industry, would pay the elaboration of studies and individual licensing of establishments that adopted the existing derogations from the current building regulations.
To a 38.100 t.m. studied 17.500 t.m. covered surface, re, with the aim of granting a single and comprehensive authorisation. For the needs of the project prepared the explanatory report of utilization of the property for development purposes through divestment.
Accordingly, and in accordance with the needs of the company we have taken:
STUDIES | |
---|---|
1 | Writing statement of utilization of the property for development purposes through the sale of public land |
2 | Single topographic mapping for new and existing land 38 acres |
3 | Write a new chart coverage in accordance with the applicable specifications |
4 | Setting atrocities |
5 | Architecture mapping |
6 | Studies of structural adequacy |
7 | Single study fire protection |
8 | A single study of electrical and substation |
9 | Single mechanical study of the production equipment |
European technical standard order authorisations | |
---|---|
1 | Technical reorganization permit |
2 | Granting a derogation |
3 | Building permit legitimacy |
4 | Inclusion in standard environmental commitments |
5 | Archive study on the Fire Service |
6 | Definition of a zone of slavery transit lines high-voltage admie s. |
7 | Notification function |
Acquisition municipal area
With the new law sale of municipal land, indivisible, i.e. without the possibility of partition, the company applied the acquisition of a specific area, contiguous, even if it wasn't for programming structures in this. Specifically, the area that had an elevation difference with the existing plant, and, moreover, passing through that cable lines high-voltage Distribution Network Operator (DNO).
This gave a great advantage during the phase of acquisition, because the only reason interest was the annexation and exploitation of this area to increase the rate of coverage of the existing installation. This is the reason proposed by the ΙΩΝΙΚΗ Engineering the acquisition through participation in the contest posted by the Municipality of Xanthi. Due to the peculiarities mentioned above, there has been no claim of the area by a third party.
By the time of the takeover, and later, the industry entered a new phase of operation.
Held single, detailed topographic mapping new and existing land 38 acres and was drafted new chart coverage of the plants. The building structures of the company was carried out architecture mapping and prepared study of structural adequacy.
With the aim of addressing the facilities overall, prepared study of fire safety ιn the three building complexes of ΣΜΥΡΔΕΞ, the overall volume was divided into individual fire compartments. This strategy aligned the fire safety measures taken with the applicable legislation, as it reduced the volume into smaller sections, thus allowing the studies to establish the legal conditions for minimal subsequent interventions in the existing buildings.
For the preparation of electrical studies, an inspection was carried out at the site of the industrial units to enable the mapping of the electrical installations. Subsequently, the electrical installation floor plans and the single-line diagrams of the panels were prepared. Additionally, the substation of the factory was redesigned along with the distribution single-line diagrams of the panels.
Finally, prepared single engineering equipment and production both for the lodging of a notification function from the ΙΩΝΙΚΗ Engineering as well as for the submission of a dossier investment ΙΩΝΙΚΗ Finance.
License technique for reconstruction of a single space after a single engineering study
For the download of the notification function, it was suggested that the above annexation of neighbouring, in the facilities of the ΣΜΥΡΔΕΞ, pieces, with the aim of increasing the coverage rate of the total area. This proposal has succeeded in increasing the coverage factor, and it led, at the methodical movements, in building permit legalizations at the maximum rate.
The next step was the preparation of technical reorganization permit, single space, then a single engineering study, which allowed for the lawful operation and saved the necessary time, driving without hindrance in the adoption and download approval of a derogation and in building permit legitimacy.
Granting a derogation for legitimacy, for the avoidance of settlement on the interest of the company
The approval for a derogation concerning the rate of coverage of the surface, and the lateral distance of the buildings from the boundaries of the field.
The result of methodical of these events was, ultimately, the disclosure function of the industry with coverage of all the activities and facilities. The distances and the existing facilities, claimed the derogation as the result of a traffic study within the area. The capacity of the installation, the movement of truck transport of the products, and, of course, the motivation of the unit for 40 consecutive years, was the major reasons of documentation of the derogation, as he had.
Studies of a total installation of an industrial complex
The architectural survey, following the topographical survey of the unified area, was the initial stage that was a prerequisite for the execution of all subsequent studies. Due to the extension over time, all building structures, which differed in design and construction materials used during the years of their implementation, had to be documented.
Studies of a total installation of an industrial complex
The architectural survey, following the topographical survey of the unified area, was the initial stage that was a prerequisite for the execution of all subsequent studies. Due to the extension over time, all building structures, which differed in design and construction materials used during the years of their implementation, had to be documented.
This was the main reason of the necessity of studies of structural adequacy. Recorded all of the structural elements and the study of the static efficiency per building.
By recording the size and volume of the buildings, a unified fire protection study was conducted to take into account the overall building and coverage data of the facility. The new study covered the needs of the overall firefighting complex and the measures for the entire installation. The existing situation was studied so that the interventions secure the installations with the least possible change to the pre-existing networks.
Exactly the same logic has been prepared single electrical study after the existing substation. The recording of the electrical installation gave me the ability to control the compliance of the network in the standard HD 384 and were made where necessary, the appropriate modifications.
In the initial stages of the studies, written single engineering study, including the substation, equipment and machinery of production per section. Categorized for the raw materials and finished products in both production and processing. This study outside of the submission of the authorisation, this is the background to the development of electrical projects and production processes for many applications (from ISO up to a background of techno-economic studies investments, expansion and modernization).
Licensing Challenges
For a smooth and short processing of money when you opt-out of the industrial plant, was chosen the granting of such licences, which would ensure the orderly and smooth functioning of the business. Within the period of reconstruction, the unit had to adjust any arbitrariness was to redesign the facilities of various specialties of mechanical and receive all the environmental and other approvals services in order to be issued the final planning permission.Throughout the course of this work, there was not a moment of the proper operation tosh unit. The licensing worked out as planned and the company arrived at the point of implementation of all planned and budgeted work of development and modernisation.
Specifically, the unit, joined in parallel in the context of the development of a law for the modernization of machinery, through the company ΙΩΝΙΚΗ Finance of the group.Actions of ΙΩΝΙΚΗ Finance, to meet the growing needs of the company, submitted a proposal investment plan for inclusion in the provisions of the investment Law 4399/2016 in the scheme "General Business".
The investment plan of € 940.000,00€, which was prepared from the strains of ΙΩΝΙΚΗ Finance it included new mechanical equipment for the expansion of the production line, a new system for storage of ready-made product as well as the necessary machinery transport of these products.For the completion of the process was a study of the viability of the investment as well as the necessary feasibility study.
Project team
PhD, MBA, Electrical Engineer
M.Sc. Civil engineer
AutoCad Designer
Licensing of industrial plant production of abrasives
ΙΩΝΙΚΗ Engineering
At a Glance
Client
ΣΜΥΡΔΕΞ
Website
smirdex.gr
Year of Assignment
2019
Location
Vitiligo, Xanthi
Area
17.468 t.m
Project budget
38.555€
Implementation Duration
2 years
Since 1981, the company ΣΜΥΡΔΕΞ offers on the domestic and world market products abrasives of high quality. With respect to the environment, with high quality products and through continuous research, the ΣΜΥΡΔΕΞ managed the continuous expansion of its activities.
Knowing gradual development, and by focusing on the commercial activity in the international market, now responsible for 85% of its production to Europe, Asia, Africa and 15% in the Greek market. The products of the ΣΜΥΡΔΕΞ are exported to more than 72 countries.
The explanatory report of utilization of the property for development purposes, through divestiture
The premises of the ΣΜΥΡΔΕΞ, due to rapid increase of the capacity of the industry, would pay the elaboration of studies and individual licensing of establishments that adopted the existing derogations from the current building regulations.
To a 38.100 t.m. studied 17.500 t.m. covered surface, re, with the aim of granting a single and comprehensive authorisation. For the needs of the project prepared the explanatory report of utilization of the property for development purposes through divestment.
Accordingly, and in accordance with the needs of the company we have taken:
STUDIES | |
---|---|
1 | Writing statement of utilization of the property for development purposes through the sale of public land |
2 | Single topographic mapping for new and existing land 38 acres |
3 | Write a new chart coverage in accordance with the applicable specifications |
4 | Setting atrocities |
5 | Architecture mapping |
6 | Studies of structural adequacy |
7 | Single study fire protection |
8 | A single study of electrical and substation |
9 | Single mechanical study of the production equipment |
European technical standard order authorisations | |
---|---|
1 | Technical reorganization permit |
2 | Granting a derogation |
3 | Building permit legitimacy |
4 | Inclusion in standard environmental commitments |
5 | Archive study on the Fire Service |
6 | Definition of a zone of slavery transit lines high-voltage admie s. |
7 | Notification function |
Acquisition municipal area
With the new law sale of municipal land, indivisible, i.e. without the possibility of partition, the company applied the acquisition of a specific area, contiguous, even if it wasn't for programming structures in this. Specifically, the area that had an elevation difference with the existing plant, and, moreover, passing through that cable lines high-voltage Distribution Network Operator (DNO).
This gave a great advantage during the phase of acquisition, because the only reason interest was the annexation and exploitation of this area to increase the rate of coverage of the existing installation. This is the reason proposed by the ΙΩΝΙΚΗ Engineering the acquisition through participation in the contest posted by the Municipality of Xanthi. Due to the peculiarities mentioned above, there has been no claim of the area by a third party.
By the time of the takeover, and later, the industry entered a new phase of operation.
Held single, detailed topographic mapping new and existing land 38 acres and was drafted new chart coverage of the plants. The building structures of the company was carried out architecture mapping and prepared study of structural adequacy.
With the aim of addressing the facilities overall, prepared study of fire safety ιn the three building complexes of ΣΜΥΡΔΕΞ, the overall volume was divided into individual fire compartments. This strategy aligned the fire safety measures taken with the applicable legislation, as it reduced the volume into smaller sections, thus allowing the studies to establish the legal conditions for minimal subsequent interventions in the existing buildings.
For the preparation of electrical studies, an inspection was carried out at the site of the industrial units to enable the mapping of the electrical installations. Subsequently, the electrical installation floor plans and the single-line diagrams of the panels were prepared. Additionally, the substation of the factory was redesigned along with the distribution single-line diagrams of the panels.
Finally, prepared single engineering equipment and production both for the lodging of a notification function from the ΙΩΝΙΚΗ Engineering as well as for the submission of a dossier investment ΙΩΝΙΚΗ Finance.
License technique for reconstruction of a single space after a single engineering study
For the download of the notification function, it was suggested that the above annexation of neighbouring, in the facilities of the ΣΜΥΡΔΕΞ, pieces, with the aim of increasing the coverage rate of the total area. This proposal has succeeded in increasing the coverage factor, and it led, at the methodical movements, in building permit legalizations at the maximum rate.
The next step was the preparation of technical reorganization permit, single space, then a single engineering study, which allowed for the lawful operation and saved the necessary time, driving without hindrance in the adoption and download approval of a derogation and in building permit legitimacy.
Granting a derogation for legitimacy, for the avoidance of settlement on the interest of the company
The approval for a derogation concerning the rate of coverage of the surface, and the lateral distance of the buildings from the boundaries of the field.
The result of methodical of these events was, ultimately, the disclosure function of the industry with coverage of all the activities and facilities. The distances and the existing facilities, claimed the derogation as the result of a traffic study within the area. The capacity of the installation, the movement of truck transport of the products, and, of course, the motivation of the unit for 40 consecutive years, was the major reasons of documentation of the derogation, as he had.
Studies of a total installation of an industrial complex
The architectural survey, following the topographical survey of the unified area, was the initial stage that was a prerequisite for the execution of all subsequent studies. Due to the extension over time, all building structures, which differed in design and construction materials used during the years of their implementation, had to be documented.
Studies of a total installation of an industrial complex
The architectural survey, following the topographical survey of the unified area, was the initial stage that was a prerequisite for the execution of all subsequent studies. Due to the extension over time, all building structures, which differed in design and construction materials used during the years of their implementation, had to be documented.
This was the main reason of the necessity of studies of structural adequacy. Recorded all of the structural elements and the study of the static efficiency per building.
By recording the size and volume of the buildings, a unified fire protection study was conducted to take into account the overall building and coverage data of the facility. The new study covered the needs of the overall firefighting complex and the measures for the entire installation. The existing situation was studied so that the interventions secure the installations with the least possible change to the pre-existing networks.
Exactly the same logic has been prepared single electrical study after the existing substation. The recording of the electrical installation gave me the ability to control the compliance of the network in the standard HD 384 and were made where necessary, the appropriate modifications.
In the initial stages of the studies, written single engineering study, including the substation, equipment and machinery of production per section. Categorized for the raw materials and finished products in both production and processing. This study outside of the submission of the authorisation, this is the background to the development of electrical projects and production processes for many applications (from ISO up to a background of techno-economic studies investments, expansion and modernization).
Licensing Challenges
For a smooth and short processing of money when you opt-out of the industrial plant, was chosen the granting of such licences, which would ensure the orderly and smooth functioning of the business. Within the period of reconstruction, the unit had to adjust any arbitrariness was to redesign the facilities of various specialties of mechanical and receive all the environmental and other approvals services in order to be issued the final planning permission.Throughout the course of this work, there was not a moment of the proper operation tosh unit. The licensing worked out as planned and the company arrived at the point of implementation of all planned and budgeted work of development and modernisation.
Specifically, the unit, joined in parallel in the context of the development of a law for the modernization of machinery, through the company ΙΩΝΙΚΗ Finance of the group.Actions of ΙΩΝΙΚΗ Finance, to meet the growing needs of the company, submitted a proposal investment plan for inclusion in the provisions of the investment Law 4399/2016 in the scheme "General Business".
The investment plan of € 940.000,00€, which was prepared from the strains of ΙΩΝΙΚΗ Finance it included new mechanical equipment for the expansion of the production line, a new system for storage of ready-made product as well as the necessary machinery transport of these products.For the completion of the process was a study of the viability of the investment as well as the necessary feasibility study.
Project team
PhD, MBA, Electrical Engineer
M.Sc. Civil engineer
AutoCad Designer
Responsible for Programming
Electrical Engineer